High Speed Automatic LD-100H 90-95PCS/Min Bonnell Spring Coiling Machine
Basic Info
Model NO. | LD-100H |
After-sales Service | Lifetime |
Warranty | Lifetime |
Certification | CE |
Condition | New |
Control | Automatic |
Type | Mattress Spring Machine |
Production Speed | 90-95 PCS/Minute |
OEM/ODM | Welcome |
Spring Dia. | 62-95mm |
Spring Height | 80-190mm |
Spring Coils | 4-7 Coils |
Main Drive Power | 5.3kw |
Swift Frame Power | 2.2kw |
Spring Wire Gauge | 1.9-2.4mm |
Heat Treatment | 15kVA |
Transport Package | Sample Packing |
Specification | LD-100H |
Trademark | Lianrou-Dekui |
Origin | China |
HS Code | 8463900090 |
Production Capacity | 20sets/Month |
Product Description
LD-100H High Speed Bonnell Spring Coiling Machine is an auto machine that is making mattress springs. It combines coiling, knotting, heating and outputting total four procedures in one machine. The speed is at 90-95 springs one minute. The coiler LD-100H utilizes a fully integrated computerized Programmable logic controller (PLC) and servo control system. All machine functions include wire feeding length, knotting, heat treatment, lubrication and self-protecting are automatically controlled.
Technical Characteristics:
1. High capacity with minimum space requirements - up to 45600 Bonnell Springs / 8 hours.
2. Rapid change-over.
3. Easy operation and short training period thanks to clearly structured concept with integrated control unit.
4. Top quality and ease of use.
Detailed PhotosProduct Parameters
Technical specification:
Spring Type | Bonnell |
Production Speed | 90-95 Springs/Minute (adjustable) |
External Spring Diameter | 62-95mm |
Spring Height | 80-190mm |
Spring Wire Diameter | 1.9-2.4mm |
Spring Coils | 4-7 Coils |
Power Requirements | 3XAC380/50-60HZ |
Main Drive Power | 5.3KW |
Swift Frame Power | 2.2KW |
Heat Treatment | 15KVA |
Machine weight | 2650KG |
Q. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance. Other payment terms can also be negotiated.
Q. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q. How about your delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q. Do you test all your machines before delivery?
A: Yes, we have 100% test before delivery.
Q. Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
Q: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.